Recent federal legislation established new performance management requirements for metropolitan transportation planning.

Establishment of Targets by the MPO 

23 CFR 490.105 (f)(3) 

Target establishment options. For each performance measure identified in paragraph (c) of this section, except the CMAQ Traffic Congestion measures in paragraph (f)(5) of this section, and MPOs meeting the criteria under paragraph (f)(6)(iii) of this section for Total Emissions Reduction measure, the MPOs shall establish targets by either:

  • (i) Agreeing to plan and program projects so that they contribute toward the accomplishment of the relevant State DOT target for that performance measure; or
  • (ii) Committing to a quantifiable target for that performance measure for their metropolitan planning area.

Download
TPM targets workbook 

NYMTC chose option (i) for all targets shown below. 

Safety  
Safety Targets

Bridge Condition on the National Highway System (NHS) 
bridge cond636961434255553167

Pavement Condition on the NHS (Interstate & Non-Interstate Facilities) 
pavement cond

Travel Time Reliability (Interstate & Non-Interstate Facilities) 
TravelTimeReliability

Freight Movement on Interstate Roadways (That are part of the NHS) 
InterstateFreightPerf 

Total On-Road Mobile Source Emissions Reduction 
CMAQ_OnRoadMobile 

VOC= Volatile organic compounds
CO = Carbon monoxide
NOx = Nitrogen oxides
PM10 & PM2.5 = Particulate matter
 

Urbanized Area-Level Targets (New York-Newark, NY-NJ-CT Urbanized Area): CMAQ Congestion Performance Measure

Annual Peak-Hour Excessive Delay per Capita (PHED) 
CMAQ_CongestionPerformance

CMAQ Congestion Performance Measure: Non-SOV Travel 
CMAQ_CongestionPerformance_2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Download
TPM Targets workbook →