Most of the data used to define the highway network was
drawn from existing sources such as networks developed for
previous studies, including:
|
1 |
Interim Analysis
Method (IAM) TRANPLAN network for New York counties. |
|
2 |
LongIsland
Transporation Planning (LITP) 2000. |
|
3 |
ConnDOT highway
network for Connecticut counties other than Fairfield. |
|
4 |
NJDOT Tranplan
network for New Jersey counties. |
BPM Highway network is a very large network consisting
of 52,794 links in 28 counties in NY, NJ and CT. and covers
all NY Metro Area. The Highway network contains:
|
1 |
4950 high-level
facilities |
|
2 |
26,385 Arterials |
|
3 |
10,694 centroid
and external connectors |
|
4 |
10,765 other |
The Base Network contains some attributes that reflect
four different time periods:
|
1 |
AM peak (6-10AM), |
|
2 |
Midday (10AM-3
PM), |
|
3 |
PM peak (3-7PM),
|
|
4 |
Night (7PM-6AM). |
Downloadable files
Document
TM 11.2 (522kb PDF file)
Tables
Lane
Miles and Center Lane Miles
(8kb PDF file)
2012 & 2035 Average Annual Growth Rate for Vehicle Miles of Travel (VMTS)
(66kb PDF file)